Job Details
Experience Needed:
Career Level:
Education Level:
Salary:
Job Categories:
Skills And Tools:
Job Description
- Responsible for all finishing activities such as but not limited to block work & plastering, false ceiling, gypsum walls and painting, tiling and marble works, parquet flooring, and landscaping.
- To check the quality of all the materials received on site and prepare quality reports, defects, if any.
- Review requirements of the specification and relevant standards and ensure understanding and compliance of work done with the specified requirements of the specification and drawings.
- Carry out the specified inspection/test in accordance with relevant inspection/test plans, including the works of the subcontractors.
- Overall, supervision and coordination of General Foreman areas of responsibilities and the allocation of work areas.
- Follow-up with General Foreman efficient usage of materials to minimize wastage, and supervise materials storage area.
- Coordinates and monitors subcontractors for their daily construction activities and their obligations and liaison with subcontractors.
- Review and certify the payment certificates for the subcontractors.
Job Requirements
- Preferred engineering graduates Department of Architecture or Applied Arts with not less than 7 years to 10 years’ experience in the field of construction.
- Hands-on experience in supervision, coordination with activity sequencing, and handing over of work.
- Strong Finishing background with an eye for detail
- Capable of reading drawings and schematics.